We've created a self-service hub for all the information and resources you'll need before, 在, 在你的电力或天然气项目之后.  Whether you need a quick guide to get started or the latest overhead or underground construction standards, 你会在下面找到你需要的, and all documents are continuously updated to ensure you always have the latest information.

92.61 KB
PDF
地下服务
地下服务
252.90 KB
PDF
挖沟的资源
挖沟的资源
212.47 KB
PDF
额外住宅单位(ADU)核对表
额外住宅单位(ADU)核对表
207.84 KB
PDF
New Service Request Document Requirements
New Service Request Document Requirements
554.01 KB
PDF
快速计划要求
快速计划要求

生成器服务门户用户资源

This library of training videos and help guides will help you navigate the 建筑服务 Portal, 西班牙&E's self-service tool for tracking the progress of new business projects from start to finish.

快速链接
BSP教程视频

2.63 MB
PDF
建设者服务门户用户指南
建设者服务门户用户指南

电 & 气体服务

循序渐进的指导

264.89 KB
PDF
新服务的电力和天然气
新服务的电力和天然气
245.93 KB
PDF
架空和地下电线重新布线
架空和地下电线重新布线
309.73 KB
PDF
建造过程指南
建造过程指南
188.58 KB
PDF
项目生命周期概述
项目生命周期概述

计算气体 & 电负载

New tool to help estimate future load for remodeling and upgrade projects.

考虑升级面板? When you’re remodeling, expanding, adding or upgrading appliances, it’s important to work with 西班牙&E as this may affect your home, business, or neighborhoods power reliability and capacity.

免责声明: This online calculator is an informational tool intended to provide customers with basic estimates for potential future projects, and should not be relied upon to determine exact or specific load amounts. 西班牙&E makes no representations or warranties regarding the accuracy, 计算器的质量或充分性, and the results of this calculator do not constitute approved load estimates. We strongly recommend that you seek the advice of a qualified electric or gas professional before making any type of project decision.

打印气体负荷计算器
注意: Calculator is pre-populated with average loads, adjust quantity and load as needed.
打印电力负荷计算器
注意: Calculator is pre-populated with average loads, adjust quantity and load as needed.

标准及手册

130.39 MB
PDF
施工标准:架空
施工标准:架空
86.02 MB
PDF
施工标准:架空垂度 & 紧张(OH800)
施工标准:架空垂度 & 紧张(OH800)
62.10 MB
PDF
仅用于架空现场维护
仅用于架空现场维护
74.19 MB
PDF
施工标准:地下
施工标准:地下
28.66 MB
PDF
服务标准和指南手册
服务标准和指南手册
43.29 MB
PDF
配电设计手册
配电设计手册
无计量服务
无计量服务
345.10 KB
PDF
土地用途限制及常见问题
土地用途限制及常见问题
2.28 MB
PDF
土地标准及要求指引
土地标准及要求指引
69.55 MB
PDF
仅供地下场地维修
仅供地下场地维修
123.69 KB
PDF
Gas Installation Requirements: General Order 112 F
Gas Installation Requirements: General Order 112 F
311.64 KB
PDF
General 条件 and specifications for Applicant Gas Extension Construction
General 条件 and specifications for Applicant Gas Extension Construction
216.69 KB
PDF
General 条件 for Underground 电 Distribution, Service Systems Construction and Gas Trench
General 条件 for Underground 电 Distribution, Service Systems Construction and Gas Trench

形式

81.50 KB
医生
索取电子地图资料
索取电子地图资料
863.33 KB
PDF
索取气体地图资料
索取气体地图资料

Finding a Contractor Qualified to Perform Backfill

This list is provided for convenience only, and the contractors are not endorsed or preferred by 西班牙&E. This is not a complete list of contractors who are qualified. Any contractor with a valid Veriforce Field Verification Report (FVR) with the appropriate Backfilling qualifications is qualified to perform the backfill. Contractors must provide this verification upon request and keep a copy on the job site at all times.

180.88 KB
PDF
Qualified Contractor to Perform Backfill List
Qualified Contractor to Perform Backfill List

Finding a Contractor Qualified to Perform Standby Lineman Services

Contractors on this list (link) are approved by 西班牙&E as qualified electrical workers (QEW) for the performance of Standby Lineman Services in accordance with California Administrative Code – Title 8 Industrial Relations 安全 Orders – sections 2940, 2946, and 2948 and California Government Code section 4216.

The minimum clearances below apply to all persons who are not QEW authorized by 西班牙&致力于或接近可持续发展目标&E拥有高压导体.

Overhead Transmission Conflicts (69kv and above): Workers must maintain a radial clearance of at least 20英尺 or adhere to the minimum clearance distances specified in CALOSHA Section 5003.1 .工人和设备. This applies to all individuals who are not QEW approved by 西班牙&E.

Overhead Distribution Conflicts (600V – 50KV): Workers or objects not supported by boom-type equipment must maintain a radial clearance of at least 10英尺 高压导体. 臂架式起重或起重设备, 包括负载, must maintain a horizontal distance of at least 20英尺 高压导体. This applies to all individuals who are not QEW approved by 西班牙&E.

Underground 电 Transmission, 电 Distribution, and High-Pressure Gas Conflicts: 任何挖掘或灌封 10英尺 of existing direct-buried cables and duct packages require Standby Lineman Services (safety watch, 中断协调, and/or construction means and methods review).  只有可持续发展目标批准的QEW&E可以执行备用线路员服务. Schedule Standby Lineman Services in advance by contacting one of the contractors on this list linked below. 

40.53 KB
PDF
合格的备用线路员资源
合格的备用线路员资源

设计资源

The Designer Qualification Program for Applicant Design and Contract Design (ADCD) pre-qualifies non-西班牙&E设计师执行可持续发展目标&E气体和/或电气设计. The program also provides no-cost access to 西班牙&E设计工具和系统.

快速链接
设计师资格及资源